IMPLEMENTATION

Software alone doesn't run a plant.

Netzo includes the implementation path that gets operators scanning — in weeks, not years. Master data, barcodes, portals, migration, and training are in the engagement. Not surprise change orders.

IMPLEMENTATION

  1. 01DiscoverClear scope — not a feature dump.
  2. 02FoundationA model that matches how material actually moves.
  3. 03Wedge liveOperators finishing work without supervisor calls.
  4. 04HardenInventory accuracy and margin numbers that reconcile.
  5. 05ExpandOne operational chain — not parallel Excel.
  6. 06DeepenFloor execution still on the same registry.

Discovery & success criteria

Map receive → hold → ship pain. Define 90-day metrics with Plant Manager, Ops, and Finance.

Org & permission design

Warehouses, factories, legal entities, and module/portal roles so operators get stations — not full admin.

Item & package master

Tracking modes, multi-UoM, and packages set up for how you buy, store, and consume.

BOM & kit cleanup

Kit and assembly patterns that match the floor — not a fantasy engineering tree.

Barcode & hardware setup

Label variants and scanner/camera paths tied to the same stock model.

Portal stations

Role-scoped portals configured for the jobs each station actually does.

Data migration

Opening stock, lots/serials, parties, and essential documents — validated, not dump-and-pray.

Training & hypercare

Hands-on on real devices and labels, then a support window focused on adoption blockers.

Go-live means scans that stick — not a signed checklist.

  • Floor-first go-live — stations complete jobs on portals with scan feedback.
  • Wedge before expand — one warehouse and agreed workflows first.
  • Training on real devices and labels — not a classroom of screenshots.
  • Adoption hypercare — fix 'can't finish the job' issues before blaming the plant.
  • 90-day metrics agreed up front: inventory accuracy ↑, operator usage ↑, recall time ↓, month-end variance ↓.

Out of default scope — said plainly.

  • PAC stamping, CFDI XML filing, or filing with the SAT
  • Full deep-MES scheduling or cascading engineering BOM as day-one delivery
  • Full GL / AP / AR suite implementation
  • Unsupervised AI stock moves
  • Permanent on-site custom development that forks APIs
Get one warehouse telling the truth — then grow.